In the forum https://jazz.net/forums/viewtopic.php?t=4829 there is a short summary of using the corrected estimate
- My original estimate of a work item: 1d
- At the end of day 1 I have spent: 4h and I estimate time remaining as 7h.
- Therefore I put time remaining (7h) and correction (1d 3h).